Is EVA still used in solar modules?
Yes. It remains a widely used encapsulant material. The right grade still depends on the film recipe, module design and reliability target.
Application / Solar
A good film trial starts with more than a resin number. Use these grades to build a shortlist, then check the formulation, extrusion window, cure response and laminate result.
It has to run cleanly through the film line and work with the cure package, stabilizers and other ingredients. Optical and mechanical performance comes from the finished formulation and laminate—not the resin on its own.
The solar-linked group includes 28% VA grades across lower and medium flow ranges. Before choosing one for a trial, also check additives, gels, volatiles, cure response and the conditions used on the film line.
Compare candidates in the intended recipe and on representative equipment. Agree on test methods before results are compared, especially when more than one film line, plant or supplier is involved.
Grade shortlist
Use these numbers to decide what is worth testing. For specifications, test methods and current availability, ask for the latest TDS for the exact grade.
| Grade | VA content | MFR / MI | Where to start |
|---|---|---|---|
| UE2806 | 28% | 6 g/10 min | Solar & compounds |
| UE2825 | 28% | 25 g/10 min | PV encapsulant |
| V2803 | 28% | 3 g/10 min | Solar & cable |
| V2825 | 28% | 25 g/10 min | PV encapsulant |
| V6020M | 28% | 6 g/10 min | Solar & compounds |
| V6220R | 28% | 25 g/10 min | Adhesives |
MFR/MI reference condition: 190°C / 2.16 kg. These are comparison values, not contractual specifications.
Before you shortlist
Yes. It remains a widely used encapsulant material. The right grade still depends on the film recipe, module design and reliability target.
No single number makes the decision. VA content and melt flow are useful filters, but the film maker still needs to check gels, additives, cure behavior and long-term test results.
No. Reliability has to be demonstrated with the finished film, lamination process and module construction under the relevant test plan.